This series has been a zombi story ๐ – always new issues popped up as I was hoping to finish this project. This time it was the deck boards under the post, lower end of post, and mouldings of the posts.
This was another tough series of tasks as it required some physics as it required some estimation of which part of healthy post carries the load and wiggling of the post to find the room to pull out rotten boards and insert new boards and re-adjust the post’s location to spread the loads to newly installed boards.
Plus – this required me to run 45 degree cut on making manual post moulding which was fun! ๐
Wondered around Seattle U’s campus for the first time in my almost two decades of life at Seattle ๐ cozy and nice campus but – as a parent who went thru crazy college application process – I wondered where this school has been during the crazy growth of UW and UW Bothell in last decade.
Maybe their lucrative environment -closest to downtown core and ability to target lots of part time post graduate students – might have produced relatively less focus on undergraduate programs.